| 1 | Ohio EPA official in Air Quality Division. Develop program to reduce ozone depleting emissions by 50% in cooling equipment. |
| 100 | In the role of consultant to a start utility reulatory commission to advise a planning for the energy future for the state. |
| 103 | Develop an environmental impact statement concerning the location of an atomic reactor along the lakeside at Gary, Indiana |
| 124 | Plan to effect an immediate cutback in energy at the park and to plan for this cutback while optimizing park usage |
| 126 | |
| 129 | Problem of locating a new rug mill in Butler County. |
| 135 | Consider the design, development and location of new cooking oven facility in the Middletown area as requested by RMCO |
| 140 | Consider design, development and location of a conveyor belt to carry coal from the Athens, Ohio area to the Ohio River for barge carrying. |
| 145 | Play the role of a consultant employed by a private foundation to help determine whether it should purchase an 80-acre Boy Scout camp for use as an environmental education center. |
| 153 | Explain how he would evaluate an application from a major oil company to the Bureau of Land Management requesting a lease to extract shale oil from public lands in wester Colorado. |
| 158 | How would you develop a policy for using the campus power station to incinerate vials of radioactive scintillation fluids used in research at Miami University? |
| 160 | Disposition of radioactive water at the Three Mile Island nuclear plant site |
| 171 | Describe the application of the problem-solving process to the development of a recommended use for a 50 acre lake for a private, profit-making corporation |
| 176 | How she would establish policies for water use in the state of Colorado. |
| 177 | Descirbe the development of a management strategy for dealing with toxic waste/hazardous material train derailments for the Canadian Pacific Railroad. |
| 178 | Develop a well illustrated methodology for preparing alternatives to implement a 10% reduction in energy for the City of Hamilton, OH |
| 179 | The planing process for a 100-acre outdoor recreation facility for Butler County. |
| 180 | Development of a National Recreation Area in southeast Indiana. |
| 188 | Dealing with acid rain and plant ecology. |
| 194 | Technology assessment of a new field drawing upon past history of technology development. New government agency that handles all new inventions. |
| 195 | Visibility of national parks |
| 196 | The student must imagine himself in a high-staff position in the Department of Energy, in a division concerned with long-range planning. Specifically he is to act as the head of a DOE taskforce developing strategy for keeping energy conservation a foregr |
| 2 | You were hired by a grass roots organization in a community located near a military chemical weapons facility that is scheduled to be closed next year. The community is concerned about minimizing the environmental and economic effects of the elimination |
| 200 | Develop plan of investigations for planning a new pulp mill west of Porcupine Mountains on a trophy trout stream. Site is in wetlands area. |
| 202 | The Scotia County Foundation has asked you to develop a plan to best utilize the natural resources of the county. Industrial development is a high priority but human and natural resources should be protected |
| 203 | Powerplant siting on Scotia River, fossil fuel fired. Dan is the leader of group for Buckeye Power to acquire site and receive all approvals. |
| 204 | Sally was asked to develop a Public Awareness Campaign concerning waste disposal for a city in Brazil. She is a WHO representative and had approximately one year to develop a campaign for the city. |
| 205 | Should we have an additional tax on gasoline? |
| 206 | Energy consultant to architectural/engineering firm regarding construction of a home office building for a "Fortune 500" company in Denver area, preferably within 1/2 hour of major airport. |
| 207 | Dioxin contamination |
| 208 | Develop environmental education program for emotionally disturbed children, age 13-15, male and female, to be implemented at a rural facility. The Children came from a dense urban area. |
| 209 | A paper company wants to locate a new mill in a particular town in IN [Taiwan??]. You work for the Taiwan govt. and have responsibility for developing the regulaitons concerning water usage and efficitine characteristics that the mill will have to meet. |
| 211 | 1) As a consultant to the national park services, you are to recommend whether to develop a uranium deposit on the land of a national park in the US southwest adjacent to an Indian community containing important Indian relics - as a result of a request fr |
| 212 | 25% Energy reduction plan for GE jet engine plant. Middle manager coal fired power plant. Steam torbine, 2000 people, 3/4 sq. mile under roof. |
| 213 | Evidence of dioxin found in Michigan rivers. Several flow into Lake Huron, a commercial fish bay that is source of fish used for fish used in Passover. New York, Chicago, and Cleveland get most of their fish from this fish bay. Prepare plan of investig |
| 214 | Describe the clean up and certification as safe the clean up of an abandoned, mismanaged toxic waste site in an Eastern Urban community. |
| 215 | Set up a plan to reduce municipal and industrial waste into Harbor of Naples, Italy as representative of US government on loan. |
| 216 | The BLM has extensive holdings in the last central portion of Montana which have the potential for development of a coal-mining/power plant facility. There is just to the east of the BLM land, a proposed Great Plains National Park which is expected to be |
| 217 | Outlining studies required for State of Ohio to file formal action relative to federal plans for disposal of Wayne National Forest. |
| 219 | A pest is destroying cows [corn?] in Southwestern Ohio that may e capable of rapid spreading - appointed chair of special task force with an adequate budget ($1 M) and 6 months to complete a final report |
| 220 | As VP of Community Affairs for a local community group, prepare community information program defending the siting of a secure landfill on an old industrial site. The site is supported by Sierra Club and all permitting agencies. Opposition has developed |
| 221 | You are the head of the staff for the Ohio Citizens Advisory Committee on Acid Rain. You are to inform the board of the major impacts of acid rain and advise them on policy alternatives. |
| 222 | Prepare a guide for use and ultimate disposal of toxic wastes, pesticides, and herbicides in Middle East. She is a policy maker and administrator for the UN and is assigned to the area of the Middle East. The student is charged with leading a group to d |
| 223 | To design a waste disposal system for a growing city which has only used sanitary landfill to the present time. The problem is complicated by a growing industry with toxic waste output. |
| 224 | As a consultant to the city of Oxford, Ohio, how would you implement a study examining the feasibility of establishing a supplemental water supply. |
| 225 | As Forest Service ranger in Kentucky, develop plan for using land with intermixed federal and private holdings. Oil reserve exists and wells were drilled in 20's and 30's. Wells weren't used much until 70's when price went up. Some wells need recharge, |
| 226 | Jon works for an engineering consulting firm that has for one of its clients designed a landfill for a location in rural Hamilton Co. Jons assignment is to prepare a report on the landfill that is addressed to the county zoning commission which is likely |
| 227 | Construction of a dam is being considered on a river in Africa to control floods. A small rural town is adjacent to the river. The task is to do an environmental impact analysis. The setting is that of a UN rep. |
| 228 | You are head of AZ state task force to develop a 20 year plan for water and wastewater management. Both surface water and groundwater are to be addressed, and the impact of optimal utilization on agriculture, commerce, manufacturing, and residentail deve |
| 229 | Site a new landfill for the city of Middletown with recogniton of the groundwater. |
| 230 | Evaluating alternatives for adding hydroelective facilities to dam on Gauley River. Consideration of effects on ecology, economy, and effects on rafting. |
| 231 | Develop guidelines for mineral exploration and development near national parks and wilderness areas. Located in office of secretary of interior. |
| 232 | Develop outdoor education center in a South African area for grades to age 11-12 years. Chuch sponsored program to be admininstrated by a church group. 2-5 year time frame. |
| 233 | The student is to serve as a project leader for an engineering team that ARCO has hired to recommend six oil/gas drilling sites in an 18 sqare mile salt marsh area in Costal Louis, with specific recommendations to minimize the ecological impact but remain |
| 234 | Impact of landfill on water quality - student bired by Hackensack Water Company to judge impact of Clarkston landfill on water quality. |
| 235 | Serve as consultant to high federal government official to advise on how to make the people of the country aware of the present state of the environment and motivate them to be more concerned about the condition of the environment. |
| 236 | Develop plan of investigation for a large tract of land in S.E. U.S. Tract is being considered for designation as an eastern wilderness area. There is interest by mining companies in strategic minerals development and by timber companies in furniture grad |
| 237 | "Silicon Valley" type of development; problem of ground water contamination from solvents storage facility leakage (potential). Develop safety plans (monitoring) |
| 238 | The gov't of India has made a grant to the city of Bombay to establish a model solid waste recycling plant. Bombay has agreed to furnish a site. Determine a master plan. Uses of the materials, making it cost effective, and making it energy producing. He |
| 239 | Prepare a report for the Sierra Club on a possible nuclear plant siting on a midwestern river. Give alternatives and impact of such a plant. |
| 240 | The county commissioners of Butler County have become very interested in having Indian Creek, north of Reily, designated as a scenic river, for purposes of both recreation and preservation. You have been hired to assess the feasibility of having the cree |
| 241 | Hazardous waste byproducts. From a chemical facility in Monterey are to be disposed of in a environmentally sound fashion. The student is part of the team to indentify a site that's acceptable to a representative of each of the appropriate constituencie |
| 242 | Establish hazardous material emergency team - centered on Dayton area - out of Kettering Hospital |
| 243 | How would you prepare a multi-media/interdisciplinary presentation on the problems of surface mining and water quality in Eastern Kentucky? Emphasis should be given to the socio-economic variable, the hydrological setting, surface mining technology and t |
| 244 | Develop plan of investigation for dealing with fish kills in Acton Lake. Possible source of problem includes pesticide runoff, heavy metal runoff from Talawanda springs plant, nutriten and sediment runoff |
| 245 | Yellowstone National Park. Visitation increases have been large. Is it desirable to limit visitation at the park? What public info programs might be appropriate? Develop a plan. |
| 246 | Preliminary testing of the aquifer beneath the Chem-Dyne site has shown the presence of toxic materials. You are a consultant hired by the city of Hamilton to assess the problem because they fear: 1) possible contamination of nearby waterwells currently |
| 247 | Head a team of six with a budget of $2 million and a 2 year period to develop an environmental awareness program for a Latin American country. The examinee was asked to apply the problem solving process. |
| 248 | Leader of task force on West Virginia Abandoned Mine Lands. Prepare plan of investigations for determining extent of problem, possible solutions, funding, organization, standards. |
| 249 | Runoff from an agricultural area (irrigated) into a canal that flows through as wildlife refuge appears to be causing death and damage to waterfowl. Prepare plan of investigations. |
| 250 | Describe the IES problem solving process as it would apply to the prep of a feasibility study for an international airport in the Dayton-Cinci region. |
| 251 | It has been suggested that there is an inadequate number of nature preserves in SW Ohio. Is that true? Are more needed? If so, where should they be and what should be provided in them? How funded? The student is to be a staff person in Nater Areas O |
| 252 | Develop plan for environmental geology investigations of a proposed retirement community in Southern California. |
| 253 | Develop plan of investigations for transport of hazardous substances through Cincinnati metropolitan area. To be done from standpoint of OKI Counil of Government at request of local government. |
| 254 | Prepare organization plan for wastewater management in an African developing area. Located on coast. One major city, with several industrial centers and large rural areas. Serving as consultant to the government from UN for a 2 year period. |
| 255 | ChemLawn of Columbus involved in a suit re:Groundwater Contamination by herbicide and pesticide. The student is to develop a management plan to minimize the impact on groundwater, etc by their operation. Outline plan, implementaion, evalutaion. |
| 256 | State EPA has received complaints from citizens in a neighborhood of a metropolitan area. Complaints include odors, suspected hihg incidence of illness among children, and loss of vegetation. They suspect toxic wastes from industries located in the area. |
| 257 | As a consultant to NOVA; the student was asked to prepare a project proposal for a program that would bridge the gap between the technical realities and the lay perception of the hazards of nuclear power. The recent Chernobyl incident was to be the take-o |
| 258 | The city of Richmond Indiana, has requested state permission to locate a supervened hazardous waste disposal site in the Whitewater River basin. The city sewage plant and probably industrial wastes feed into the basin. An investigative committee of the l |
| 259 | As an employee of General Electric Co., he is to evaluate a 3000 tract of land owned by G.E. Includes testing pods for jet engines, wooded areas, streams, etc. He is to propose alternative plans for use of the site. GE wants to maintain a good public imag |
| 260 | The student was placed in an environmental consulting firm retained to develop the documentation to make application for a permit to operate an open ocean incineration facility off the coast of New Jersey. |
| 261 | A water sample from a farmer's new well was sent to the OEPA for testing. OEPA staff member calls farmer to tell him water has high levels of radioactivity and is unfit for human consumption. Farmer engages the student as consultant to investigate probl |
| 263 | Management of predators and big game in Yellowstone National Park. Develop info base for Congressional oversight committee that would be used either for modifying existing legislation and for appropriation requests. Concerns have been expressed to the c |
| 264 | She was hired as an independent consultant to assess a proposal to change the Red River Gorge National Forest to a national park. Also, to investigate acquisition of private ad state land for the park. She has 6 months and $50,000 to complete her study. |
| 265 | As consultant to City of Cincinnati, prepare plans for uses of a large closed landfill, with unknown mixed components. There are no obvious known problems with the site. The city wishes to find uses that will be of benefit to the community. It is willi |
| 267 | After Soviets evacuated Kiev following nuclear accident, the student will head a UN team to determine whether water supply is safe to allow repopulation. |
| 270 | You are an enforcement officer of Ohio EPA assigned to assess the complaints about possible radioactivity in the city well field. Identify the problem ( is it real), assess the potential consequences and make recommendations to city and Ohio EPA official |
| 271 | Battelle Lab in Columbus. You are group leader in GW Resource Analysis. The above lab is the consulting firm hired by Ohio EPA. Objective is to look at groundwater supplies around the SE corner oh Ohio in relationship to maintaining acceptable GW quali |
| 272 | Develop a model to apply to the impact of deforestation. |
| 273 | You are a consultant for the Dept. of the Interior. Prepare a land management plan for a park surrounded by a national forest. |
| 274 | As employee of Rockefeller Foundation she is leading a team that is inventing a tropical island about the size of Ohio in the Carribean, whose resources have been exploited at the accelerated rate. Threatened geologic, floral, and faunal resources, minera |
| 275 | |
| 276 | Determine extent and kinds of soil and groundwater contamination resulting from radioactive materials handling at the Fernald facility should consider ground water flow at regional and water table scales. |
| 277 | A county in southeastern Ohio is in its last stages of being stripmined: 1) What are the major problems associated with this mining? 2) What measure would you recommend to the county commissioners for reclaiming this land? 3) How might the reclaimed lan |
| 279 | Prepare monitoring plan and system for air quality at GE Evendale, operating under buffer concept. |
| 280 | The Sherwin Williams distribution center in Dayton burned. Water and foam were used to put out the fire. Dayton well field for water supply is nearby and there is a stream beyond the well field. Determine effects on aquifer and stream. Position is with |
| 281 | Develop an outline for an Indian national policy governing the storage of hazardous and toxic substances. Assume that at present no |
| 282 | Do a study plan for a new source of freshwater for a city which now faces inadequate supply. |
| 283 | Setting: Fernald plant in Ross Problem: Special advisor to Westinghouse Goals: 1) Provide advice on how to structure a research program to identify true environmental situation 2) Propose a public info program to improve image of Fernald pass. |
| 284 | One county has legal rights to water in a lake in another county and now wants to begin using that water. The second county protests. The student has been oppointed by the state to put together a team that will invertigate and mediate. |
| 285 | Dow Chemical, Midland, MI, identified as accidentally spilling PCB into local river. Candidate works as environmental specialist to assess the extent of the problem, alert public, and make recommendations. Given three months, $100,00 to complete exercis |
| 286 | A major fish kill in a Michigan lake. As head of MDNR, devise a plan to minimize risk to public health and environment and prepare guidelines to prevent recurrence. |
| 287 | Prepare a preliminary EIS for a 50-mile diameter supercollider place in vicinity of Austin, Texas. Texas is trying to diversify economy. Supercollider will also be connected with a mine mouth electric generating plant about 50 miles from the ring. Sub- |
| 288 | 5000 acres of land that had been mined is given to state of Ohio. DNR is undertaking investigation of developing potential, including user needs and land capability. Problem is how to conduct the study. |
| 289 | Examine decline in salmon population in Southern Alaskan stream. Federally owned forest land. Alaskan natives are allowed to live on the land and by tradition have fished this stream. In recent years there has been a huge increase in gold-mining activi |
| 290 | Possible diversion of water from Gt. Lakes including L. Superior, into Miss. R. System. Concern about effects on both Gt. Lakes System and Miss. R. Prepare feature story for Sunday St. Paul Pioneer Press, followed by series the following week. Develop co |
| 291 | The student is a consultant to Department of Energy developing an Environmental Impact Statement concerned with the effects of locating the Super Collides. Five states are being considered: OH, IL, TX, CA, MA. |
| 293 | Mike has been hired by a southern Illinois county as a land use expert to develop in the next 18 months, a 20-25 yr. Plan for the land use of the county. Of specific concern is a trait of land surrounding the county seat and surrounded by prime agricultur |
| 294 | As an employee of an American Oil Company consortium, Rita is to investigate the feasibility of building a pipeline that crosses the border between Alaska and Canada. She is to find out the relevant regulations in both countries, learn about likely proble |
| 295 | ODNR will open a new, small state park at Sandusky. It will have a children's museum which has a focus on resource management. Lisa is to design the educational program (displays, programs, materials, etc.) There is a fairly large empty building with enou |
| 297 | You are a consultant for Bulter County Commissioner. Develop methodology to find the best site for Champion's landfill in 6 months. |
| 298 | As a consultant to Cuyahoga and Lorain counties, advise the county commisioners on what posture they should adopt on the lakeshore management bill pending in Ohio legislature. Consider land up to approximately 2 miles inland from lake shore. |
| 299 | Lake Erie fish with abnormalities-sport and commercial fisherman unhappy OEPA called in. Rumors that sources may be genetic engineered organisms from Shore Lab, point source (city) and nonpoint air/agriculture. Develop plan to determine and connect the |
| 300 | Need for selection of appropriate technology to expand electrical generation capacity in S. India. |
| 301 | As staff member working for City Council, the student is to respond to citizen complaints about quality of drinking water. The student is to determine whether there is a problem and its dimension. Then, design a PR compaign for conveying findings to cit |
| 302 | Devise an education program (K-6) to explore what W/H is to do at Fernald. |
| 303 | A 100 square mile area in Missouri or ND, proposals for 2 conflicting land uses. One mining recreation. The interested parties of use - Indians, recreational development, mining, and farmers. State dilemma how to use the land. Consultant to State agen |
| 304 | Role: Environmental staff person in office of Mayor of Detroit Situation: Chrysler's Dodge plant at Detroit and Hamtramck. Condemned by cities of Detroit and Hamtramck in order to make a site available for a new GM plant. Residential housing and comm |
| 305 | Commercial fisherman located on bay at Quante have observed tumors and leasons on their catch. The student works for the ministry of Environment and are to find the source of the problem. The river flowing into the bay has a municipality of 15,000 peopl |
| 306 | Large landfill proposed for area NW of Dayton Airport. Miami Conservancy District has been notified by DEPA of the application. Application envisions receiving solid wastes (non-hazardous) from other states. The student is to act as consultant to Miami |
| 308 | Govenor of Alaska concerned about danger posed by natural and man-made disasters to the Alaskan coast-commissioned 2 year study, 6 persons, to produce Integrated Disaster Management Plan |
| 310 | Design a program for an env. Consulting firm to help clients comply with laws on env. Qualtiy assurance in real estate transfers. Two programs: 1) Investigations for buyer 2) maintenance for owners |
| 311 | Tester's idea - acquire land in eastern OH former strip mines - goal to create a huge wildlife reserve - home to wildlife from all over the world - limited with zools all over the US - so 1) be a reserve 2) supply zoos. Role develop educational plan to |
| 312 | Official asked to do an environmental impact assessment of a 200 square mile tract desired to develop by Brazilian entraprenuer |
| 313 | A town of 20,000 in SE Ohio has contaminated water (mining/agriculture). The consultant is asked whether the city should rehabilitate old wellfield or find a new water source. |
| 314 | New national park established in northern Minnesota. Full range of public info activities needed. She is incharge of planning these activities and also will sit on policy board that is planning park startup. Native American Treaty rights and interests |
| 315 | Dredge sediments in shipping lanes of Lake Erie that are contaminated with toxic substances, transport them by ship to an Eastern Lake Erie port for transshipment by rail to closed coral surface mines in Eastern Ohio. His portion is project manager for p |
| 316 | She is to lead a team representing the UN to Africa to investigate poaching of animals in Africa. She is to formulate a series of investigations that would lead to programs and policies that would reduce or eliminate poaching. |
| 317 | Prepare environmental assessment for a highway in the US 27 corridor between Ross and Richmond. Employed as project manager in consulting firm under contract ODOT. Route selection hasn't been done yet. |
| 318 | Consultant employed by Minnesota Division of Wildlife. 3 months and less than or equal to $50,000 to evaluate the value of three competing programs advocated by lobbying groups: 1) wildlife rehabilitaion, 2) hunters -- want game management, 3) habitat p |
| 319 | Brazilian government interested in restoring an area of cut-over jungle and protecting adjacent uncut forests. Student is asked to prepare a plan that would enable finding out what previously existed, how to restore and protect for the forest. |
| 320 | Fire at Sherwin Wiliams paint warehouse in Dayton. Toxic materials are percolating into the soil above an acquifer that contributes to the city's well field. As project manager for a consulting firm, student is to investigate the extent of contamination |
| 321 | As official of NPS, evaluate potential loss of plant and animal species from Yellowstone fire and work with surrounding USFS land and officials. 12 months for study, then write up. Mgmt plan must be approved/funded in DC, so must have qualifications. |
| 322 | A spill has occurred at a paper plant 10 mi. N. of Dayton along the Miami River. Spill not reported for 48 hours. Spill has been cleaned up, but OEPA, your employers, wants to assess impact and establish monitoring system for early warning of future spill |
| 323 | Passive smoking policy at UNC. |
| 324 | OEPA, PA officer - prepare plan to address new legislation on stringent storm water quality in Shenandoah |
| 325 | Develop framework for undersatnding the nature of the policy conflict vis-a-vis gambling on the Mohawk reservation in up-state New York and the Canadian border. What environmental policy factors characterize the issues with respect to policy management? |
| 326 | Develop a model township that is energy efficient outside Washington D.C. |
| 327 | You will chair a joint commission of Department of Natural Resources representatives from PA and New York. The commission has been given the charge to develop a wetlands plan for the Lake Erie Drainage area to be considered for the adoption by the legisla |
| 328 | Design a camp that is environmentally conscious in site/design - curriculum 1) sensitive and 2) improvement |
| 329 | Consultant for Brazilian gov. Encroachment of miners on relatively pristine area with tribes that have little previous contact with problem in past. What do? 1 yr/s staff, and you |
| 330 | Student has been asked by the city of Dayton to recomeend a recycling progrma in response to Ohio House Bill 592. |
| 331 | City downstream from 4 towns water pollution severe. How to evaluate, solve problem and education. |
| 332 | To develop a land-use plan for a 100 square mile area in Latin America. The land has been set aside in a "debt-for-nature" swap and the student is an in-country advisor for Nature Conservancy. The 100 square miles has been cut both for slash-and-burn ag |
| 333 | Fish kills have seen observed in Lake Erie increasing exponentially over the last five years. Ohio EPA has been contacted and the student, as an Ohio EPA employee, has been directed to evaluate the problem and to make recommendation concerning mitigation |
| 334 | He is in OEPA SW district office - In charge of managing permitting process for Champions Riley Landfill. Needs to account for public reaction, potential job loss if landfill not approved, plus technical factors. |
| 335 | Student is contracted by the state of Montana to provide an unbiased environmental evaluation of a proposed nuclear waste repository near Glacier National Park. The state is interested in the costs/benefits of establishing the site in western Montana. H |
| 336 | Decrease in panthers in Everglades. Hypothesis is Hg contamination. Your work for Florida DNR - what to do? ($100k) |
| 337 | Develop an island off Costa Rica for the "ultimate" ecological vacation area for families - "Club Ecologica" |
| 338 | Colorado Molybdenum Company (CoMoCo) has hired PRC consultants, your employer, to help them meet water quality problems - their marginal and remote. I want a cheap solution that will get them off hook w/ EPA. |
| 339 | As US EPA employee develop recommendations to congress committee regarding lawn care services. |
| 340 | Bush honeysuckle is posing an economic problem in SE Ohio. Should state of Ohio embark on a program to eradicate it chemically? |
| 341 | Large irigation district northeast of Cuidol, Victoria gets its water from a resevoir. Towns displaced. Some corners were cut in planning the project and problems have been encountered. Describe the problems that would be expected in a situation of thi |
| 342 | NPS has been cleaning gyser areas in Yellowstone and putting in dump. Now have potentially toxic leachate, other environmental problems - in public eye. Special assistant to NPS director. |
| 343 | Founding editor of newsletter focusing on air quality that deals most specifically with the new Clean Air Act. Discuss audience, content, etc. |
| 344 | As leader of an integrating task force under auspices of council on environmental quality, evaluate methods used by Exxon and others in dealing with effects of oil spills. Stream cleaning has especially been criticized in recent past as causing more harm |
| 345 | Develop environmental ed/rec program in Tetons for inner-city kids. Park service has not worked with inner-city kids before so employees need education too. |
| 346 | To develop a use plan for Olympia NF and the yew tree in the forest. Medical research has indicated that the yew bark seems to a potential treatment for cancer. The student is a consultant for the US Forest Service to try to resolve the "use" issue of t |
| 347 | Ringer, Inc., a manufacturer of an oganic lawn treatment substance, hwas used radio and TV and print media advertisements attachingits principle comptetitor, Scott lawn products. In these ads, Ringer claims Scott is using chemicals harmful to environment |
| 348 | Native American lands I Alaska. Oil is present in commericailly available quantities. US oil company has offered to develop it. Tribal Council wants pros and cons and gets matching funds from AFSC to hire student and five others to study it. 1 year du |
| 349 | Working as free consultant to Hillside Trust to help Cincinnati sovle combined sewer overflow problems. |
| 350 | Submit a proposal to build state of the art, environmentally sound paper mill in India. Discuss resources and technology. |
| 351 | National Forest land grazing rights have been in effect for a long time. Env. groups claim grazing has harmed the forests. Forests have in - holdings of private land. Small towns dependent on ranchers and might become ghost towns. |
| 352 | As an environmental consultant for the citizens of Boulder, CO (near Rocky Flats) you are to assess options for cleaning up the area. Citizens are concerned that the government clean up is problematic and may in fact generate additional harmful exposure. |
| 353 | In charge of project to promote higher degree of understanding in Oregon about the issues of logging in Oregon. Works with a new non-profit organization formed exclusively to deal with this issue. Board of Directors includes representatives of env. grou |
| 354 | Do public information plan to gain acceptance of a waste incinerator as part of the Butler infectious medical county solid waste management plan. |
| 355 | Ashland oil spill in Pittsburgh. Position is env. Specialist in natural resources cabinet. Responsible for tracking and responding to spill in all aspects. |
| 357 | Leads Ohio task force to maintain OH econ. Health while complying w/ SO2 regs of Clean Air Act. |
| 358 | Environmental manager of company. Company has substantial land assets in prize locations, but land may have liabilities. Company is not in full compliance without SHA regs. And EPA's in 2 states. |
| 359 | Manufacturer which has long bid for gov't contract. If it doesn't get the contract the company will have to file for bankruptcy. If it does get it the company will be out of compliance with discharge permit. Contract will require use of waste streams. |
| 360 | The US had sprayed paraquat on marijuana plants 5 years ago. Now Mexico wants an environmental impact assessment of the spraying, remediation and alternatives |
| 362 | Highway is proposed from Corolla, NC, to Virgina Beach. Pressure from Virginia Beach is important for development. She is consultant to state of NC. Is to study proposed development and submit recommendations to state of NC for what position should tak |
| 363 | Works for city of LA. Has waste incinerator S. Central LA touted as economic devel. Sierra Club organizing AF America, Koreans, Hisp., population against it. Make recommendations to resolve in 6 months. |
| 365 | National forest lands in New Mexico. Grazing land and timber land, some overgrazing. Physical conditions sustainable for reintroduction of Mexican red fox but overgrazing has reduced quality of habitat. |
| 366 | An expansion of Sun City -- do impact assessment of a new subdivision in an area that is especially concerned with water. As the consulting firm, you have been hired to the developers to come up with ways to address any water problems. |
| 367 | Ministry of environment is considering ecotourism as means of economic development. Also faces problem of increasing elephant population which are destroying savannah and village and croplands. Ecotourism would include both "beautiful" and "ugly" situat |
| 368 | Large rural ag chem plant and major employers receiving complaints of odors and smelly drinking water. He's environmental head at the plant. |
| 369 | ODNR Division of Soil and Water env. Division. In charge of program to reduce nonpoint source pollution from agricultural land, while simultaneously increasing any use of unconventional materials, such as municipal sludge, manure, and composted yard wast |
| 370 | Do a model of the "closed loop" waste stream - how much can be "used," recycled in an effort to reach waste for municipal solid waste landfills. |
| 371 | Darke county poultry manure is problem to be resolved by student including working with farmer to implement. Student's position is 50:50 OSU faculty/Agriculture Extenstion Office. |
| 372 | State of Washington has mandated a disp. Resolut/arbitration between "Save the One" coalition and the timber industry. 3 months. Need to develop positive image of the STO and position for negotiation. |
| 373 | Indiana DEM in charge of writing policy for review of district solid waste plans. Industry wasnts it quick and simple, citizens want it thorough, State wants minimal impact on human resources. Six months, 2 person staff. |
| 374 | The student is an employee of Rumpke charged with reclaiming Rumpke's dump and returning it to the community as an asset. Develop alernative land uses, detail procedures, evaluate and conclude. |
| 376 | Disposal of tin ore tailings from new Malaysian mine to employ 500 workers. Current land use is ag. Minimize displacement of people. (200 farmers) |
| 377 | Develop a 1 week seminar for middle managers of major industrial corporations to help them become environmentally sensitive and develop improved practices in the company. |
| 378 | Sustainable development plan for a township just past the outermost fringe of the city |
| 379 | You are the team leader of a group of people give the responsibility to design a facility with minimum environmental impact to manufacture parts and misc. for trucks. Location is rural area not far from Shanghai. Facility will employ 8000-10000 people. |
| 380 | UNEP employee. Develop public participation in cleanup of Lake Baikal and suggest what policies and/or procedures might be adapted from other countries. |
| 381 | Works for FAA - needs to investigate post-flight nausea and headaches especially on airlines. Five people, three months, air quality implicated. |
| 382 | Water contamination problem from landfill or farm run off. Eight acrelandfill sted on KARST one mile from city in N. Kentucky. Shallow well next to landfill has contamination. Analysis. BOD 250 mg/l, COD 500 mg/l, Pb 5 mg/l, Cd 1 mg/l, pesticide.005 m |
| 383 | New acquisition for state fresh. Do management plan. |
| 384 | Design a plan for a biosphere reserve in Inner Mongolia to preserve biodiversity |
| 387 | Evaluate ecotourism as an economic development option for the trees in Northern Ontario. Prepare to include conservation of lands, economic development, and environmental education. |
| 388 | As Waste Management Inc employee, develop corporate strategy for landfill siting nationwide. |
| 389 | Paper company has 500 square miles of uncut forest in Northern Maine. Wants to cut 75% of the forest over a five year period two years from now. Her position is that of team leader to develop plan for harvest that will maximize regrowth potential and mi |
| 390 | Chemical waste management wishes to site a hazardous waste landfill in SE Ohio. He is to serve as an environmental planner for the regional planning agency which is to advise whether to host this facility. |
| 391 | DOE wants to use Fernald and Alba Craft for environmental education program. Design it. |
| 396 | EPRI wants cost/benfit on Clean Air Act renewal. Re: sulfur dioxide emission in Eastern US. Include ethical issues. |
| 397 | Mine spoiled area, after 10 years restoration not successful - explain and remediate |
| 398 | Staff member of SWRCD. Attempting to develop and implement a plan to reduce agricultural nonpoint sourve pollution in order to get into compliance with a reauthorized Clean Water Act. Paritcular concern for fertilizers and manure. |
| 399 | Guadalupe Grouse Migratory Upland Game. Bird in Tamaulipor is endangered. Local population recently discovered, but locals have been hunting it for decades and it has symbolic ceremonial significance. The student chairs group to develop conservation p |
| 401 | Site low-level radioactive facility in Ohio. |
| 402 | Design a resource sustainability study for a US/Canadian Trade Association concerned with declining stocks of lobsters. |
| 403 | PBS is considering a program on sustainable and unsustainable practices by native NC South American Peoples and how they have carried over to practices of native and industrialilzed peoples today. In 1 year with $50,000 do a still photo essay/proposal on |
| 404 | Land use plan for the closed landfill in Oxford. |
| 405 | Don Kaufman is going to raise $500,000 for next phase of H.V. fundraising campaign in keeping with philosophy. Eli Lilly would donate $300,000. |
| 406 | Develop "Green House Seal" for the Real Estate Market. |
| 407 | As Director of US Biological Survey, prepare program for inventorying habitats in western US, especially those that contain endangered species. |
| 408 | Develop National Resource and Stewardship Education Center for ODNR. Where, what, how much? The student has staff of 3 plus and $50,000, 6 months. |
| 409 | Research and Planning Office of Electric Utility. Upper Management unsympathetic/uninformed re:greenhouse gases. Explain to them what to do and why, both as individual Co. & in conjunction with others. |
| 410 | Private consultant for waste management which is shipping MSW to Dominican Republic. Enviro groups and stockholders are protesting, but D.R. finds arrangement a boon to economy. Design a plan for a win/win/win solution. |
| 411 | Develop a restoration plan (physical env. social) for a region six square blocks - HAPSO, Keep America Beautiful. Block Grave |
| 412 | As a consultant is to make a presentation to a potential client, a chemical manufacturer regarding air quality modeling services. Manufacturer is adopting pro-active stance. Manufacturer has been in line for 15 years, has a single plant with multiple po |
| 413 | Works for ODNR - plan env. ed. Program to inform Ohioans. RE: environment to be located on large tracts of land - design and acquire unlimited budget. |
| 414 | BCSWCD -- study of urban runoff |
| 415 | P & G composed [compost?] of trash containing 2% diapers. What about contamination? |
| 416 | The ultimate eco-town for IES students |
| 417 | Develop health and safety program for N.C. EPA and for industrial livestock farms. Principal concern is toxic algae. Include QA/QC plan. |
| 418 | Best location of new capital in Rawanda. |
| 419 | BLM representative for Nevada & Utah to work on guidelines for American Discovery Trail. Usage policies, what trail should and shouldn't be. Some local hostility to the trail and to restrictions of usage of public land. |
| 42 | |
| 420 | Management plan for army proving ground in IN with some badly damaged areas and some relatively pristine areas. |
| 421 | To evaluate a tourism/management plan for a country on the sea - abandoned military base. |
| 422 | Feds have established national monument in Utah (like staircase Escalante). Has ranchers, traditional users, Indian antiquities etc. Develop management plan. |
| 423 | Consultant to community faced with highway coming through. Fight or accept relocation. "Chicago" |
| 424 | Comprehensive plan "Race to Trails" HAPSO opposed - 12 kids |
| 425 | Develop ecotourism program for Dallas - Ft. Worth Zoo |
| 426 | As professional for NGO the International Organization for Sustainable Agriculture in the US to raise awareness and raise funds |
| 427 | 300 employee deinking mill to be built on Little Miami R. As enviro. Mgr. Must do enviro. Assessment to insure compliance, keep public happy, etc. Or another site - abandoned EPA advanced tech. Site - Lebanon Metro area. |
| 428 | camp - evacuated community to decide town's filter from flood plain. |
| 429 | Develop worse case scenario and most likely scenario to deal with chemical (ammonia) holding tank failure in Charleston W.Va. |
| 430 | Develop plan for water quality study of Sandusky R. Watershed, inc. tributaries. |
| 431 | Develop Enviro. Ed site on "contested" contaminated land in depressed Co. town |
| 432 | Environmental impact assessment of Mexican oil refining for type of trustee (NAFTA) - is there really an environmental problem for S. Padre Island. What would you recommend. |
| 434 | 100 acre lake |
| 435 | Butler County's Water Ins - identify sources and solutions |
| 436 | |
| 437 | Health effects on people in a Bulgarian city on the Black Sea - ground water problems |
| 438 | Fishing Tourist Boards - Minn, ND - Management Plan in face of possible contamination from floods |
| 439 | The white-footed ferret of N. Minn. Is a reclusive endangered species of spiritual significance to native peoples. Sightings have decreased over the last 5 years. Not much is known about it. Determine if ther is a problem and what to do about it. Empl |
| 440 | Develop 1 week program on biodiversity for middle school students at Land Between the Lakes. Seek to make program transferable |
| 441 | Controversy about the Three Rivers Gorge Dam has centered on pollutants discharged into the rivers above the dam that currently pass down the river, but would be concentrated behind the dam and not move through it after the dam is closed. How would you d |
| 442 | Develop state (cultural, ethno-botanical, etc) heritage museum in West Virginia |
| 443 | Land considered for park acquisition private and state land within wetland so far minor human impacts. Washington office assigns her to gather team and strategize |
| 444 | Restoration of arid pine forests in Los Padres National Forest affected by fire, El Nino erosion, and air pollution. |
| 445 | Employees in new building are complaining of sickness, poor morale is contributing to tardiness, training, and productivity |
| 446 | Smelter on S. CA border with Tijuana, Mexico has emission problem affecting neighbors on both sides of border. Mostly Hispanic workers live around plant. Mexucan gov't upset. EPA wants to shut plant for non-compliance. Workers worried about their heal |
| 447 | |
| 448 | Prepare land use/management plan for Lorain Ohio's industrial and related areas. Steel and shipbuilding on Block R. valley are defunct. Lakeshore not well developed in past becasuse of the unattractiveness of the industries. He is a consultant to Lorain |
| 449 | |
| 451 | To help Butler County gain public acceptance of a waste to energy facility |
| 452 | On loan from the USEPA to Wisconsin DEP - 90 days to reco what to do about longer term issues following major train derailment and fire. |
| 453 | Family land 600 acres what mission alternative to condo development - 1 year to do plan |
| 454 | AK Steel. Indoor and outdoor air quality investigation. Sources and funds and quantities of air pollutants. Strategy to reduce pollution. |
| 455 | OSHA consultant - examine safety practices for imigrant workers in Michigan cherry picking ops. |
| 456 | EIS for 25 years strip mine zone for Allyaz Power - recv./ |
| 457 | Hamilton County wishes to enlarge its system of nature preserves. Some restoration will be required. 2 Year assignment with budget of $300,000/year. Develop plan to reach some minimum percentage of land in nature preserve. |
| 458 | Consultant to large landowner in Venezuela - advise on possible ecotourism in Mongrove islands/low land rainforest. Some indigenous people on site. |
| 459 | On staff of an Indian State environmental agency. Pharmaceutical company considering location in the state that would discharge into sacred waters. Mediation role between public, compnay and the state. |
| 460 | Negotiate a harsh? agreement for a site in the 4 corners region chosen as 1 of the 3 for the low level radioactive waste disposal site for the 4 corners compact |
| 461 | Provide recommendations in 6 months on how to reconstruct the original ecosystem of a tropical island. Will be financed by a consortium that would like to build high class condos for people who value being in a "natural" tropical island ecosystem. |
| 462 | Development near closed A.F. base in Florida. How provide drinking water? |
| 463 | As ODNR employee, determine why water quality in E. Fork of Little Miami is deteriorating, and devise plan to restore. |
| 464 | Ohio River shore west of stadiums between route 50 and the river. A/E firm is engaged to plan upscale housing condos while removing the industrial area and loading docks. Blue collar community north of route 50, with pockets of more upscale neighborhood |
| 465 | Cleveland Science Museum, Revamp displays and interactive exhibits to accommodate wider age ranges and provide multiple dimensions of a theme for those who visit the museum frequently. |
| 466 | After floods in Fargo, ND, councilman in another city is concerned about hazards from flooding in old industrial areas near river, some still in use. Others on council are sceptical. As a consultant, you have two months to make recommendations. |
| 467 | Old mining site deforested area in Minnesota national forest to be turned over to the state, develop habitat restoration plan. |
| 468 | Okracoke Island marsh ecosystem has been severly damaged by hurricane. As NCDNR employee you have 3 months to assess damage and develop restoration plan. |
| 469 | ODNR Bureau Mine Recly. Re-evaluate mine restoration programs. Desire to change focus to native ecosystems. Also interested in timber industry. |
| 470 | Watershed in Adams County. Two praries of endangered plant species and protected status. TNC wants to provide further protection of those species. Cons and purchases are both possiblities. Also desired are improvements in water quality. |
| 471 | Determine water quality plan for Great Miami town development. |
| 472 | City of Milwaukee water supply contamination by Cryptoporidium. Short term and long term solutions. |
| 473 | Point person for world wildlife fund to investigate charges that WWF is not really doing right things to protect endangered species. Specific deficiencies are: working on glamourous species, failure to deal with poaching, bribing of other govts. |
| 474 | A virus introduced into rabbit population on an Austrailian island has jumped to mainland and is spreading slowly through rabbit population. Defenders of Wildlife seeks to formulate a position on either supporting a rapid introductio of virus to prevent |
| 475 | Develop and implement a problem to help teachers apply critical thinking to environmental issues. |
| 476 | Beach new Waikiki that has attracted high visitaion and has been degraded. Develop inventory of the area, education plan, and mitigation strategies. |
| 477 | Japanese built copper mine and smelter in Peru is major polluter of air, water, of land. Indigenous people unhappy with the mine, but Perusian gov't likes the revenue. U.S. and Japan agree to remediate it under U.S. supervision. The student heads the t |
| 478 | Consultant charged with preparing documentation to support permit application for Lawrenceberg riverboat gambling. Franchise holder wants to move process along quickly. Consultant has told client that all aspects of the projects would have to be include |
| 479 | Rocky Mountain National Park hasn't had a major fire in a long time. Forest threatened by disease. What to do? Want multiple alternatives. Need to consider social/legal aspects as well. |
| 480 | Nature Conservancy has gotten $1 million request to do high school teacher education on biozones contintent-wide basin in North America. Should local program have a lasting component to it. Design and run program. |
| 481 | Develop environmental education program in controlling disease urban/suburban district in civic area. |
| 482 | Develop research design to determine how a filter strip removes nutrients from surface runoff. Emphasis on microbes. Would like to find out whether removal mechanisms are primarily mechanical or biomechanical. |
| 483 | Insurance industry wants proposal from resources for future public info campaign on global climate change. |
| 484 | SE Ohio mine reclamation criteria require grass. Is this a good requirement? If not, recommend revisions in the regulations. |
| 485 | Aerial application of pesticides to forests in Western Oregon has prompted citizen concern. Possible affects include sport fishing and disturbance of terestrial communities. As researcher in US, Oregon lab the student has responsibility for recommending |
| 486 | What position should New York environmental organization take on Hudson Bay hydro project given that power is needed in New York City? |
| 487 | Developer has hired student as wetlands expert. Developer has 50 acres including 11 acres of wetland. Developer had environmental conscience and also wants to appear green. He is curious about wetland banking and mitigation. 6-9 months, $50,000 -- Ad |
| 488 | Develop curriculum to use environmental disasters as case studies for teaching about environment. First case to be Chernobyl. |
| 490 | Feasibility study for Native American (Rute) tribe on Pyramid Lake - use ecotourism/casinos |
| 491 | Develop management plan for brand new 500 square mile National Forest near Wayne FW. Opportunity for implementing ecosystem management from scratch. 4 years, $1 million. |
| 492 | Prepare plan for Everglades restoration under assumption that climate change world occur within a few decades exhibiting itself in the level of noise, increased temperatures and increased precipitation. |
| 493 | Nonprofit research analyst to create plan for coastal protected reserve in Central Ameican country. |
| 494 | Prepare conceptual design for an Olympic village in Beijing, with special consideration given to environmental factors. |
| 495 | EIA of rice farming in California Sacramento River. Works for state. Issues raised by Sierra Club include groundwater contamination and wetland/water foul. |
| 496 | Develop environmental curriculum for grade 9-12 military school that does not compromise math/science curriculum. |
| 497 | In charge of special commission reporting to Butler County commissioners, examining problem areas in land use in BC. Need to develop recommendations for priorities sites of concern and remediation stratigies (initial thoughts on implementation plans). I |
| 498 | Dayton Paint Fire near well field - assess damage suggest mitigation and future prevention. |
| 499 | Kenyan watershed management plan. |
| 500 | Works for county with high quality stream with mulitple uses (drink water, wastewater, recreation). Moderate development is beginning to affect water quality. Evaluate problem, suggest solution, educate public. |
| 501 | Red tide in the Chesapeake Bay -- plan to address and remedy. |
| 502 | 100 acre abandoned p & p mill site on NC coast. Develop plan for city of 10,000 to acquire or not. |
| 503 | Hamilton County wants a risk management assessment of the open face of Rumpke |
| 504 | Environmental impact assessmetn of 50 mile radius of Sarajevo |
| 505 | Develop a pilot study to determine the effects of excreted pharmaceuticlas on aquatic ecosystems. |
| 506 | International Joint Commission in water, Israel. Develop a water management plan for issues of quality and quantity. |
| 507 | Conservation International, Guatemala. Mapping shows several hundred square miles of threatened tropical forests. Prepare plan to preserve and/or restore these lands. Joint planning groups from CI(Wash.), CI(Guatemala), and representatives of host country |
| 508 | Evaluate problems and technological solutions for GW issues in Latin America and advise philanthorpist what to fund |
| 509 | Proposed expansion of Smoky Mountains N.P. claims of indigenous residents who are Appalachian families whose ancestors have been ther for almost two centuries. What to do with these claims and claims of those who were displaced 60 years ago. Harpers Fer |
| 510 | Starting manager for nature conservancy in Texas. Concern is some wetland fbird areas in Tamaulipas now being used as hunting and nature reserve. Hunters come from Texas and Arizona. Threat from Intercoastal Waterway proposal, which would have habitat |
| 511 | Plan a demonstration farm for sustainable agriculture in Franklin County, Indiana. Incleing the operation of the farm itself and a plan for extension of the farm's practices to farmers in the area. |
| 512 | Develop reclamation plan for surface mined coal mine in E. Kentucky. Includes some wetlands and woodlands. |
| 513 | Position is with Sierra Club Cincinnati Office. His portfolio is to be advocate for limiting urban sprawl. Ongoing position, but emphasis is on coming up with plan over next couple of years. |
| 514 | MTBE (gasoline additive) in water systems in New Hampshire. |
| 515 | 1000 acre development in NE Ohio with substantial wetlands. Works for developer as liason with regular agencies and community |
| 516 | Develop plan to minimize environmental impact of Carlton College |
| 517 | She is consultant to the Ohio legislature. Oversight by the bipartisan members of Senate and Gen. Assemmbly. Task is to prepare report to legislature that sets forth issues that have to be addressed to be successful. Primary thrusts are sprawl, balance be |
| 518 | |
| 519 | Env. Assessment closing Washington National airport |
| 521 | Restoration of rip arian zone in a county stream with fish kills, algae blooms, etc. Flows by hog farms and croplands into reservoir that is used for recreation. |
| 522 | Possible rebuilding after tornado of Native Ameican housing in concerned area with federal funds to do whatever citizens (tribe) desire. |
| 523 | Kenya Wildlife Service. Ungulate species in national park are declining while livestock herding is on the rise. Govt is concerned about local extinction and loss of tourist revenue. Reverse the decline. |
| 524 | Compliance with Kyoto Protocol for forest products company. |
| 525 | Develop research project in Nepal to be funded by USAID on a water resource issue that will benefit Nepal. |
| 526 | The downstream country wants water from prepared reservoir. Do feasability plan. |
| 527 | Lak with residents - tornado destroyed trailers of 300 people - plan for new uses - return of people, park, preservation industry possibilities |
| 528 | Waste Management, Inc. has been required to hire her as a consultant. WMI has acquired an old landfill which they will expand. It is just upstream of National Wildlife refuge wetland. She is to liaison between landfill and wildlife refuge. Also educat |
| 529 | Salton Sea is shrinking, maybe affecting migratory birds, also tourist business may be affected |
| 530 | As consultant to the Vermont DNR, develop a plan that restores a balance among oak, hickory, and red maple trees. Currently, red maple has assumed a position of dominance, while oak and hickory are steadily declining. Consider mechanical harvesting and |
| 531 | For Kalkaska County, MI, carbon sequestration: 1) land use/land cover, 2) Ecological classification, 3) Planning and 3 education centers, displaying landscape scales. Both restoration and preservation strategies. |
| 532 | Develop a policy/standard for the European Union to manage a chemical that has been identified as damaging aquatic life in the rhine River Basin. Chemical in widespread use by industries. The student has been hired as a consultant and has been given one |
| 533 | Appalachian communities id'd environmental problems, including water quality, junk and litter, deforestation of hardwoods. Solve these issues compatible with community and can serve to lead to economic development |
| 534 | Landfill reclamatin project - landfill closed (1 sq. mile) adjacent to and to be added to a forested state park (with lake, 2 miles from landfill) As an employee of Indiana DNR, you are to complete a one year study to develop a phased 25 year plan for est |
| 535 | Consultant to State of N.Y. W. Nile flu. Develop plan to dtermine where outbreaks might occur, plan to control the flu, and plan to get info on medical cases to N.Y. health department |
| 536 | ODNR consultant on statewide plan dealing with invasives that are commerically valuable. |
| 537 | PR consultant for consortium for GM Co's and Biochem Company. Reduce U.S. public apprehension re: GM crops. 6 mos. |
| 538 | Suriname, SA - Hired by a Conservation Foundation to assess forest reserves (15% of the country's 63,000 square miles, including a 4 million acre Central Suriname Nature Reserve) + to create a management & monitoring system, also taking into account the d |
| 539 | Ecuador-estuaries. Commercial shrimp farming being established with help of government. Potential conflict between this and indigenous extraction of marine products. Assignment: 1. Determine sources & resolution of conflict between these 2 groups. 2. |
| 540 | |
| 541 | Hired as a consultant by a citzen-based environmental organization to develop a position paper concerning the impact of the development of a retirement community complex along the Little Miami River. Position paper - position on impact to water quality, |
| 542 | As employee of USDF, head of 4 person team to develop management plan for a 400 square mile National Grassland. Grassland is surrounded by agriculture use. |
| 543 | Park Board acquired a tract of land - hired by the Board to establish a bird wildlife sanctuary. Area previously used by neighborhood residents as ballfields, etc. -- they do not want the sanctuary. Must complete a feasibility study in 6 monghs which ad |
| 544 | Employee of USEPA, develop plan for containing or removal of residues of hard rock mining in Colorado River watershed above Lake Mead |
| 545 | Develop wellhead protection program for shallow limestone acquifer in Florida. Acquifer is used for public water supply, and for ag. Uses and for bottled water. Ag use results in acquifer drawdown and in nonpoint contamination by ag chemicals. Employed |
| 546 | Oregon rep. On an inter-state taskforce to design criteria for allocation of water resources to California for emergency drought relief |
| 547 | Water Quality Management Plan for Miss. River Watershed. Works for EPA HQ. |
| 548 | East Fork Little Miami River - employed by group of counties, cities, etc. to determine source of sih?? problems and ways to remedy. How to prevent in future? There are a few domestic WWTP, agriculture, recent residential development. Must suggest solu |
| 552 | Mock comp:International Paper (IP) has acquired 725 ac of old growth redwood forest in Northern California, which they would like to log. An environmental organization would like to prevent logging on this land. As an employee of the California Dept of Na |
| 554 | |
| 556 | Mock Comprehensive Exam Problem, April 10, 1997 Midland, Michigan is the headquarters and principal manufacturing center for the Dow Chemical Company. Dow has been a major producer of chlorinated hydrocarbons such as 2,4, D, 2,4,5-T, and a number of ot |
| 558 | New Environmental Education at a magnate school that emphasizes interdisciplinary perspectives, fieldwork, and service learning. He is aked to develop a 1 year curriculum that will educate the students on two major environmental issues of importanct loca |
| 559 | Alaskan village cannery - environmental impact on aquatic and terresterial flora and fauna. |
| 560 | An employee of BLM, do an appraisal of Escalante National Monument to help assess the desirability of giving it National Park status. |
| 561 | Oakes Dam and resevoir on Missour River. Develop water quality management plan for the watershed. |
| 562 | An employee of BLM, do an appraisal of Escalante National Government to help assess the desirability of giving in National Park status. |
| 563 | Prepare watershed management plan for the streams in the 3 Valley Conservation Trust. Is employed by the Trust. |
| 564 | Well-head watershed protection for Dayton Water Authority, grassroots, industry, and development threaten the wellfield. How to protect for the future. |
| 565 | Working for EPA, site on incinerator for destruction of chemical weapons. Choose site and deal with public resistance. Treaty obligations and degradation of weapons add urgency to problem. |
| 566 | Parcel of land has been given to ODNR. Formally a wetland, but converted to row crops. ODNR is planning to restore the wetland. Develop a plan to do the restoration. |
| 567 | Alishan Village Cannery - environmental impact on aquatic and terresterial |
| 568 | Oahe Dam and reservoir on Missouri River. Develop water quality management plan for the watershed. |
| 569 | Is environmental manager for Rumpke. They have 1 year option to buy 3 sites (200 ha) for landfill within 50 km of Cinti. He must make a reco on which to buy, considering both enviro and public affairs issues. |
| 571 | |
| 59 | |
| 78 | Water supply for the city of Oxford |
| 85 | A problem dealing with the water supply of Oxford. |